Bidding deadline has passed.
Request for Quotes
38 Avenue A Demolition
Town of Montague, MA
In accordance with M.G.L. Chapter 149, the Town of Montague will receive Sealed Bids until 2:00PM on Tuesday, June 20, 2022 for the demolition and removal of the 2,200 square foot structure and all appurtenances at 38 Avenue A. All bids must be submitted in printed hard copy and include all required forms.
Construction labor associated with this bid is subject to prevailing wage rates as per MGL Chapter 149, Section 26 - 27f inclusive. OSHA 10 safety training is also required.
The RFQ may be obtained at https://www.montague-ma.gov/BIDS. Registration is required to ensure interested contractors receive all updates relative to the project bid.
The contract will be awarded to the responsible contractor offering to perform the work to specifications for the lowest bid price. Contractors must respond to all RFQ requirements, explicit and implied, and demonstrate suitable experience and satisfactory references. The Town of Montague reserves the right to reject any or all bids as is determined to be in the best interests of the Town.
Key dates:
Optional Bid Conference: Tuesday, June 13, 2022 at 1pm,
Questions Due: Wednesday June 14, 2022 at 2pm
Sealed Bids Due: Tuesday June 20, 2023 at 2pm
Bid must be delivered: 38 Avenue A Demolition Bid
C/O Wendy Bogusz, Selectboard Executive Assistant
One Avenue A, Turners Falls MA 01376
Project Contact: Walter Ramsey, Assistant Town Administrator
assistant.townadmin@montague-ma.gov
413 863-3200x 126
The Town of Montague is an Equal Opportunity Employer and does not discriminate on the basis of age, gender, race, or disability. SOMWBA certified vendors are encouraged to apply.
Last updated: 2023-07-11
test
Posted 2023-06-14
ADDENDUM #1 Issued 6/14/2023 4:30PM
ADDENDUM #1
Issued 6/14/2023 4:30PM
1. Contractor is NOT responsible to cap and remove water and sewer lines. The lines were capped at the property boundary by Montague Department of Public Works on 6/12/23.
2. HVAC fluids have been properly removed and disposed from the rooftop unit by a HVAC professional.
3. The “live” electrical service for the adjacent parking lot has been removed from the building as of 6/12/2023. Eversource is scheduled to remove the overhead connection within the next two weeks.
4. There is a hydrant on Avenue A and Second Street that are available for use by the contractor. That service can be coordinated with the Turners Falls Water Department. The Water Department (a special district separate from the Town) will meter the temporary service.
The due date has not changed. Bids are still due Tuesday June 20, 2023 at 2:00PM at the Montague Selectboard Office.
Posted 2023-06-14