Project Update and Construction Schedule
The Town of Montague will be replacing an existing 24-inch culvert with a pre-cast concrete box culvert, as well as completing roadway improvements, guardrail, and associated channel widening and grading located on South Ferry Road.
Construction is scheduled to begin Monday, August 19 and is anticipated to be completed by November 2024. During construction, the road will be closed; please seek alternate routes. The limits of the proposed road closure are shown in the map provided.
If you have any questions, concerns, or require any additional information, please feel free to contact either Bryan Ruoff of Stantec, the Town’s consulting engineer, at 603-854-9501 or by email at bryan.ruoff@stantec.com, or Assistant Town Administrator Chris Nolan-Zeller, at 413-863-3200 x109 or by email at chrisn@montague-ma.gov.
Attachment contains the following documents:
Attached File: